Poka-yoke (Mistake proofing)

Poka-Yoke:

Poka-yoke is a Japanese term developed by Shegio Shingo.

Poka-yoke means mistake proofing (error-proofing).

Poka-yoke is to identify and eliminate potential errors before they occur.

Poka-yoke is making mistakes impossible.

Poka-yoke is use of devices or method or designing systems or processes to make mistakes impossible.

Types of poka-yoke:

  1. Contact methods
  2. Fixed-value methods
  3. Motion-step methods

1.Contact methods:

These devices prevent errors by detecting abnormalities or deviations in the process.

Example 1-

A machine may have sensors that signals when a part is not at proper position. 

Machine stops before it can cause a problem.

These Poka-yoke prevents further actions untill part position is corrected.


2.Fixed-value methods: 

These types of poka-yoke are designed with fixed values or constraints that prevent errors to happen. 

Example 1-

A machine may have logics in programming that signals when a tool is wear out after specific number of machining. 

Auto cycle stops for checking the tool condition or tool change confirmation after specific frequency which is derived from past data.

These Poka-yoke prevents further process untill tool wear is confirmed and corrected.

3.Motion-step methods: 

Poka-yoke tools use the operator's body or other interfernce in the way of machine.

It detects and prevents errors by cycle interuption or by no cycle start message.

Example 1- 

A machine starts with two hand control start buttons at a time.As it requires to use two hands to activate a control button, accident will not occur  while one of the hand is in a dangerous position.

Example 2- 

On automated line production, some light sensor curtains are used to avoid door opening, or part declamping by operator while cutting cycle is running.


Benefits of poka-yoke:

  • Poka-yoke prevents mistakes from occurring.
  • Poka-yoke reduces costs.
  • Poka-yoke prevents accidents.
  • Poka-yoke improves quality.
  • Poka-yoke increases customer satisfaction.
  • Poka-yoke reduces breakdowns.

Comments

MOST POPULAR

Basic Work Content And Productivity Improvement.

SMED

5S What is 5S ?

JIT and Advantages Of JIT (Just In Time) Manufacturing.

Total Quality Management (TQM)

Lean management in COVID-19 vaccine production.

PPE (Personal protective equipment)

Industrial safety

Bottleneck in production process.

How to eliminate bottleneck.